AFC Wimbledon
London
AFC Wimbledon’s long-awaited return to Plough Lane represented a defining moment for the supporter-owned club. Following their formation in 2002, the ambition was to create a modern, sustainable home that reflected the values of its community — delivering a new stadium on a tightly controlled scope and budget, with every decision shaped by operational efficiency and long-term resilience.
Front Five was appointed to deliver the full mechanical and electrical installation across the stadium. This included critical infrastructure, life-safety systems, specialist lighting, security and building-wide environmental controls, all integrated to support reliable match-day operations and an enhanced fan experience. The result is a future-focused facility designed around the needs of its supporters and built to serve as a lasting home for the club.